Murphy Contracting Company has reached the size where we can cater to the diverse requirements of our valued clients. It is important to us to have the right tools for the job. 

FEATURED PROJECTS & IMAGES
Some of the major projects we’ve completed in the past few years:
(click image to enlarge, click again to return to thumbnail view)

Innovation Park Industrial Subdivision Phase 3 for the City of London in London, ON (2010)
  • Cut and filled 1,095,000 m3 of earth moving
  • Completed all water, sanitary and storm services
  • Constructed two storm water management ponds
  • Constructed all roadways including asphalt and lighting
  • Completed all landscaping
  • Completed on time and under budget
Waste Management Landfill

Green Lane Landfill Site Cells Expansion for the City of Toronto Southwold Township, ON (2010)
  • Moved 800,000 m3 of clay
  • Placed Leachate pipe, stone and geotextile
  • Completed on-time!

Twin Creeks Landfill, base preparation cell 1A for Waste Management in Watford, ON (2010)
  • Moved 340,000 m3 of earth
  • Constructed liner system including layers of geotextile, stone, clay and HDPE pipe
  • Completed on time!

Ridge Landfill Expansion for BFI Canada Inc in Blenheim, ON (2010)
  • Moved 30,500 m3 of earth
  • Placed geotextiles, HDPE pipe and Stone for Leachate collection system

Gas Collection and Leachate Extraction Systems for Waste Management in Watford and Petrolia, ON (2010)
  • Constructed wells for extraction system
  • Constructed collection systems
  • Supplied and installed compressed air system

Warwick Expansion Phase 1 for Waste Management in Warwick, ON
  • Moved 940,000 m3 of earth
  • All underground services
  • Stormwater management system
  • Primary electrical servicing
  • Methane gas collection
  • Leachate distribution lines
  • All internal roads and ditching including placement of granulars
  • Completed in 100 working days!
Waste Management Landfill-Aerial View
Waste Management Landfill Waste Management Landfill
Waste Management Landfill
Waste Management Landfill Waste Management Landfill

New cell construction at the Green Lane Landfill for Green Lane Environmental Group Southwold Township, ON
  • 900,000 m3 of earth moved
  • Leachate system installed including stone, piping and manholes
  • Completed on time and within budget!
Green Lane Landfill - Aerial View
Green Lane Landfill Green Lane Landfill

Ethanol Plant for Integrated Grain Processors Co-Operative in Aylmer, ON

  • Moved 200,000 m3 of earth
  • All underground works
  • All internal roads including granulars
  • Railway spur
  • Stormwater management pond
  • Landscaping, fencing
  • On time and within budget!
Ethanol Plant - Aerial View Ethanol Plant Ethanol Plant

Commercial/Industrial Site Preparation and Stormwater management for Ferrero Canada Inc in Brantford, ON

  • 960,000 m3 of earth moved in 3.5 months!
  • Done well ahead of schedule and under budget
Ferrero Canada Plant
Ferrero Canada Plant Ferrero Canada Plant

Design build 5/8th mile race track for Dorchestor Downs in Dorchestor, ON

  • Designed various tracks for client to try to replicate Georgian Downs in Barrie, Ontario
  • Design included the best use of existing ground contours to achieve an economical design and a winning track!
Dorchester Downs Race Track
Dorchester Downs Race Track Dorchester Downs Race Track

More of our projects completed to date-->click here
 

MURPHY CONTRACTING CO. LTD., 4412 MANNING DRIVE, LONDON, ON. N6L 1K5

info@murphycontracting.ca
 
phone 519.668.5666
fax 519.649.4344

 

visit End of the Line for all your web & graphics