Innovation Park Industrial Subdivision Phase 3 for the City of London in London, ON (2010) |
- Cut and filled 1,095,000 m3 of earth moving
- Completed all water, sanitary and storm services
- Constructed two storm water management ponds
- Constructed all roadways including asphalt and lighting
- Completed all landscaping
- Completed on time and under budget
|
 |
|
| Green Lane Landfill Site Cells Expansion for the City of Toronto Southwold Township, ON (2010) |
- Moved 800,000 m3 of clay
- Placed Leachate pipe, stone and geotextile
- Completed on-time!
|
 |
|
Twin Creeks Landfill, base preparation cell 1A for Waste Management in Watford, ON (2010) |
- Moved 340,000 m3 of earth
- Constructed liner system including layers of geotextile, stone, clay and HDPE pipe
- Completed on time!
|
 |
|
Ridge Landfill Expansion for BFI Canada Inc in Blenheim, ON (2010) |
- Moved 30,500 m3 of earth
- Placed geotextiles, HDPE pipe and Stone for Leachate collection system
|
|
|
Gas Collection and Leachate Extraction Systems for Waste Management in Watford and Petrolia, ON (2010) |
- Constructed wells for extraction system
- Constructed collection systems
- Supplied and installed compressed air system
|
|
Warwick Expansion Phase 1 for Waste Management in Warwick, ON |
- Moved 940,000 m3 of earth
- All underground services
- Stormwater management system
- Primary electrical servicing
- Methane gas collection
- Leachate distribution lines
- All internal roads and ditching including placement of granulars
- Completed in 100 working days!
|
|
 |
 |
|
 |
 |
|
| New cell construction at the Green Lane Landfill for Green Lane Environmental Group Southwold Township, ON |
- 900,000 m3 of earth moved
- Leachate system installed including stone, piping and manholes
- Completed on time and within budget!
|
|
 |
 |
|
Ethanol Plant for Integrated Grain Processors Co-Operative in Aylmer, ON
- Moved 200,000 m3 of earth
- All underground works
- All internal roads including granulars
- Railway spur
- Stormwater management pond
- Landscaping, fencing
- On time and within budget!
|
 |
 |
 |
|
Commercial/Industrial Site Preparation and Stormwater management for Ferrero Canada Inc in Brantford, ON
- 960,000 m3 of earth moved in 3.5 months!
- Done well ahead of schedule and under budget
|
|
 |
 |
|
Design build 5/8th mile race track for Dorchestor Downs in Dorchestor, ON
- Designed various tracks for client to try to replicate Georgian Downs in Barrie, Ontario
- Design included the best use of existing ground contours to achieve an economical design and a winning track!
|
|
 |
 |
|
More of our projects completed to date-->click here |